Production line
The core process train, sized to your annual tonnage and product mix.
- Emulsifier (batch or continuous)
- Chemical sensitiser with temperature control
- Steel-belt cooler
- Cartridge filling and packing
- PLC control and data logging
We supply the production equipment and stay on site until your team runs it and produces qualified emulsion explosive. No process licence, no formula transfer — equipment and commissioning, nothing you have to keep paying for.
Contract to shipment in 3 months · Up to 3 projects in parallel · On-site commissioning included until first qualified product
A complete emulsion line is not one machine. We supply the process equipment as separate, independently replaceable units, so a single failure never stops the plant.
The core process train, sized to your annual tonnage and product mix.
For operations that need the explosive at the bench rather than at a fixed plant.
Critical spares identified at the design stage, not after the first breakdown.
Unit investment per annual tonne falls sharply as capacity rises. The figures below are indicative configurations — final scope depends on product mix and site conditions.
| Annual capacity | Typical monthly output | Best fit | Footprint |
|---|---|---|---|
| 1,000 t/a | ~85 t | Single mine, or a regional supplier entering the market | ~400 m² |
| 3,000 t/a | ~250 t | Contractor serving 4–6 mines in one region | ~800 m² |
| 6,000 t/a | ~500 t | National supplier with multi-site distribution | ~1,400 m² |
| 12,000 t/a | ~1,000 t | Large mining house or export-oriented producer | ~2,400 m² |
Below 1,000 t/a a compliant plant cannot carry its own fixed cost. For that demand we recommend a ground station or bulk supply — we will say so rather than sell you a line that cannot pay for itself.
Four stages. Only the first three are contractual dates — the fourth depends on your site.
We ask for your annual tonnage, product mix, ammonium nitrate source and site conditions. If the numbers do not support a plant, we say so.
Line selection, layout drawing, utility requirements, spares list and commercial terms. Written, itemised, and comparable line by line.
Manufacture, assemble and test-run at our works. You or your engineer attend the acceptance test and sign before shipment.
Our engineers attend site for installation supervision, operator training and trial production until your team produces qualified product.
Being explicit here saves both sides a wasted year. We are an equipment supplier, not a process licensor.
A copper-gold operation, cold continental climate, remote logistics.
The plant had to run through a winter where water lines freeze and emulsion temperature control becomes the whole game. Three things decided the outcome:
We are not going to claim a portfolio we do not have. This is our overseas reference. What we can tell you is what went wrong and what we changed because of it.
A complete emulsion line we built for a client in Zimbabwe, photographed at commissioning. Not a render, and not a stock photo.
Two things decide whether a handover goes well: whether the product sets evenly, and whether the people running the line can tell when it does not. This is what that looks like on the floor.
We do not publish customer names without permission. If you want to speak to a reference operator, ask us — we will arrange it wherever the client agrees.
Published from our own back office as projects move forward. Newest first.
HK-QBS successfully delivered and commissioned a complete emulsion explosive production line for a major mining client in Mongolia.
Read moreHK-QBS announces a breakthrough in mobile ground station technology with enhanced safety features.
Read moreHK-QBS has expanded its raw material supply chain to better serve the growing African mining industry.
Read moreFrom 1,000 to 12,000 tonnes per year. Below 1,000 t/a the fixed cost of a compliant plant — civil works, magazine compound, safety systems, staffing — cannot be recovered from the tonnage. For that demand we recommend a ground station or bulk supply instead, and we will tell you so.
No. We supply equipment and provide on-site commissioning until your team produces qualified product. We do not sell process licences, formula transfers or technology licensing, and our contracts do not contain that language.
In practice this is simpler for you: no royalty, no expiry date, no dependency on a licensor's goodwill.
Three months from signed contract and receipt of the down payment. Shipping, customs clearance, installation and commissioning are separate milestones — we quote them per project rather than roll them into one optimistic total.
Two or three instalments by milestone, with the balance settled before shipment. The usual structure is 30% on signing, 40% after factory acceptance, and 30% before shipment. A documentary letter of credit is also acceptable.
Three in parallel, including commissioning. That number is limited by the engineers we can keep on site, not by manufacturing capacity — it is why we do not overbook.
We provide the technical documentation your regulator will ask for — equipment specifications, layout, safety distances, utility datasheets. Obtaining the licence itself is your application, usually through a local consultant or law firm. We will tell you which documents we can supply and which we cannot.
The single most useful number is your annual explosive consumption. With that, we can tell you within one reply whether a plant makes sense — and if it does not, we will say so.